Use the shared qualification contract and release checklist. Production selects stronger obligations in the same contract.

andyl/main is the supported registry. It is a separate trust and pipeline assurance domain from andyl/testing; testing releases and testing roots never promote into it.

Follow Registry key management for the intended hardware-backed custody, independent authorities, rotation, and recovery requirements. GCP/AWS signer integration remains separate implementation work.

Main remains closed until the launch gates in canonical-releases.md are complete and a maintainer records an explicit go-live decision. Before any operation:

  1. verify a clean protected-branch source commit and contributor authorization;
  2. build one immutable Hub installer, deploy it to staging, validate it, and promote the exact store path to production;
  3. take a complete verified backup and recovery point;
  4. load only main-registry role credentials and the current environment token;
  5. record registry base commit/generation, deployment identities, key roster, operator, and UTC operation window.

#Inspect live state

Run these read-only checks before and after every mutation, in staging first and then production:

aos hub registry show --hub https://aos.andyl.org andyl/main
aos hub registry releases --hub https://aos.andyl.org andyl/main
aos hub registry cache-stack show --hub https://aos.andyl.org andyl/main
aos hub registry cache-stack validate --hub https://aos.andyl.org andyl/main
aos hub registry mirror show --hub https://aos.andyl.org andyl/main

Use https://aos.staging.andyl.org for the staging pass. A mirror or consumer cache stack is a separately reviewed signed configuration; follow the generic registry hosting guide and include it in the backup and recovery inventory.

#Bootstrap

Create the main authoring base with a dedicated andyl registry anchor and role-separated release/TUF/image authorities. Bootstrap the exact empty base with threshold-approved intents first in staging and then production using aos release bootstrap. Never reuse a testing key or import a testing registry history. Both bootstrap destinations must be empty for andyl/main.

After the andyl organization exists in staging, create the Hub topology row there through a reviewed plan, using the separately backed-up main anchor:

aos hub registry create \
  --hub https://aos.staging.andyl.org \
  --org andyl \
  --name main \
  --visibility public \
  --trust-key "$ANDYL_MAIN_TRUST_KEY" \
  --if-version absent \
  --idempotency-key create-andyl-main-v1 \
  --plan

aos hub registry create \
  --hub https://aos.staging.andyl.org \
  --plan-id <plan-id> \
  --confirm-hash <effect-manifest-hash> \
  --yes

aos hub registry show --hub https://aos.staging.andyl.org andyl/main

Review the first command's returned effect manifest before applying the second. Bootstrap and qualify the empty base in staging. Only then repeat the topology plan/apply/show and environment-specific release bootstrap in production. Creating the topology row does not authorize or publish a base.

#Candidate, stable, and emergency releases

  • Candidate plans use registry: "andyl/main", release class candidate, an -rc.N version, and the candidate channel.
  • Stable plans use release class stable, a release version without a prerelease component, and the stable channel.
  • Emergency plans use the reviewed hotfix source policy, a release version without a prerelease component, and the stable channel.
  • Edge plans use the edge channel and development versions, with the same strict pipeline provenance and independent review required for every main release. Test new build or release mechanisms in andyl/testing.

Follow the release checklist, using canonical-releases.md for command arguments, including staging, public-byte qualification, production promotion, partitioned channel advance, completion approval, TUF timestamp publication, and offline verification. Preserve the full evidence set for the retention period. Stable and emergency releases require a complete image matrix and all corresponding source.

#Routine package updates

Use the aos maintain workflow documented in the testing runbook to land source updates through a reviewed pull request. After merge, publish a candidate and qualify it; a stable release is a new closed release plan and bundle, not a retagged candidate or a cross-registry channel move.

#Keys, rollback, recovery, and removal

Rotate registry keys through signed overlap and survivor-vouched retirement. Rotate each other authority within its own threshold/root procedure. Main's out-of-band root is not disposable: an unplanned root replacement is a security incident and migration project, not an epoch shortcut.

Mirror every intended Hub publication-trust change with aos hub registry update: supply the complete overlap key set, the exact resource version from registry show, an idempotency key, and --plan; apply only the returned --plan-id and --confirm-hash with --yes. Remove an old key in a separate reviewed update only after clean clients have learned and accepted its survivor.

Changes to visibility, crawl policy, or llms.txt use the same exact-version plan/apply contract and only the corresponding registry update flags. Review and apply them in staging first. Such a configuration plan never implicitly changes keys, mirrors, cache stacks, releases, or channels.

Immutable release bytes are never overwritten. Fix a release forward and use a signed compare-and-swap channel operation when discovery must move. For Hub state loss, follow aos-hub-backup-recovery.md and restore into an isolated instance before changing production routing.

Deleting andyl/main, its root keys, corresponding source, release evidence, or backup history requires a separately reviewed retirement plan. The testing registry's disposable-data authorization does not apply to main.

Only after that plan's retention and consumer-migration gates close, capture the exact version with registry show, plan deletion, and review its effect manifest:

aos hub registry delete \
  --hub https://aos.andyl.org \
  andyl/main \
  --if-version <exact-resource-version> \
  --idempotency-key <reviewed-key> \
  --plan

aos hub registry delete \
  --hub https://aos.andyl.org \
  andyl/main \
  --plan-id <plan-id> \
  --confirm-hash <effect-manifest-hash> \
  --yes

Deleting the Hub topology row never authorizes deletion of object backups, signing keys, or release evidence.